The definition of business:

In the scope of the project; Haydar Aliyev Boulevard has been enlarged. Ağanimetullah Street has been transferred to underground tunnel and designed as two level crossroads, two tunnels in each side of Bagırov Road have been designed in parallel with Bagırov Bridge.

Our Role
•Preparation of bridge enlargement designs
•Design of shoring piles, retaining walls, Ağanimetullah tunnel piles, shoring piles, retaining walls, and underpass bridge. Preparation of Soil investigation and geotechnical reports
•Retaining wall design calculations,
•Reinforced concrete calculation for strengthening Bagırov Bridge design,
•Bagırov tunnel lighting design and HVAC