The definition of business:

Within the scope of Aydın Çine Irrigation Project Construction yapılan for Çine Plain Irrigation, it is planned to irrigate a total of 6980 ha of agricultural land by including the current project of the gross 6465 ha irrigation area and 515 ha of additional irrigation area requested by the administration.

Project Characteristics:
Irrigation
Project Location Arýn Province Çine Plain
Water Supply Gökbel Dam
Irrigation Area (ha) 6570.47 ha
Type of Irrigation Drip, Drip + Sprinkler, California
Total Length of Main Pipe (m) 11 446 ha
Total Network Length (m) 172 586.67 ha

Facilities Facilities
Title

Number of Pumps –
Pump Type –
Installed Power (Kw) –
Head (Hm) –

Scope of Services:
Preparation of projects.
Preparation of Green File and Discovery
Preparation of GISı