The definition of business:
Within the scope of this consultancy service procurement work, 1 pump station building and equipment, ETL, regulation pool, transmission line and art structures and irrigation projects of 8935 ha (gross) agricultural land will be prepared according to the piped system. The water required for irrigation will be taken from the existing Cimra C1 mainland or Gala Lake leg to the new pumping station, and the new pumping station will be promoted 100 m with a pumping capacity of 6.15 m3 / h and irrigated to an area of 8935 ha. The existing Cimra C-1 channel from 1.54 m, from the foot of the lake Gala 0.50 m will be promoted by the water intake structure will be promoted to 100 m. The installed capacity is 8250 MW and the number of units is planned as 9. In order for irrigation to be made economically, the projector will also work on alternatives of night storage ponds that will be formed from soil at one point or several points so that the station can be temporarily stored at discounted tariff at night.
Project Characteristics:
Irrigation
Project Location Edirne Province Enez District
Water Supply Pond
Irrigation Area (ha) 9051,8
Type of Irrigation
Total Length of Main Pipe (m) 30430,65
Total Network Length (m)
Plant
Number of Pumps 10
Pump Type Vertical Shaft
Installed Power (kWA) 2 * 8000
Head (Hm) 114
Scope of Services:
Preparation of projects.
Preparation of Green File and Discovery
Preparation of GIS