The definition of business:

The existing Çerkeşli Pond located in the Çerkeşli District of Osmaneli District of Bilecik Province and the Çerkeşli plain irrigation of approximately 2000 ha with open canal irrigation were rehabilitated and turned into pipes. A new project was developed for 1500 ha of new area with the water saving obtained by turning the irrigation system into a pipe. In addition, the Ikisu Pond is planned to be integrated into the project, and the irrigation of pumped irrigation has been turned into attraction.

Project Characteristics:
Çerkeşli Pond and Irrigation
Pond
Aim Irrigation
Subtype Homogeneous Soil Filler
Crest elevation (m) 367,00
Crest Length (m)
Height from the talveg (m) 22.50
Height from Foundation (m) 26.00
Body Volume (m3) –
Maximum Water Level (m) 366.75
Lake Area (km2) 1,160
Hopper Volume (hm3) 17,260

Irrigation
Project Location Bilecik Province Osmaneli District Çerkeşli District
Water Supply Çerkeşli Pond
Irrigation Area (ha) 1913 ha
Type of Irrigation Drip + Sprinkler
Total Length of Main Pipe (m) 11 296.44 m
Total Network Length (m) 85 000 m

Osmaneli İkisu Pond and Irrigation
Pond
Aim Irrigation
Subtype Clay Core Rock Filler
Crest elevation (m) 686,50
Crest Length (m)
Height from the talveg (m) 39.50
Height from Foundation (m) 43.50
Body Volume (m3) 357.015
Maximum Water Level (m) 684.82
Lake Area (km2)
Hopper Volume (hm3) 4,080

Irrigation
Project Location Bilecik Province Osmaneli District Çerkeşli District
Water Supply İkisu Pond
Irrigation Area (ha) 1160 ha
Type of Irrigation Drip + Sprinkler
Total Length of Main Pipe (m) 5749.99 m
Total Network Length (m) 60 000 m

Scope of Services:
Preparation of projects.
Preparation of Green File and Discovery
Preparation of GIS