The definition of business:

The project aims to irrigate 20585 ha (gross) agricultural land belonging to a total of 31 settlements including Hınıs and Karaçoban districts. In the summer months, due to the decrease in surface water resources, it is planned to switch to irrigated agriculture with the tubular system in order to obtain the desired yield and increase the economic level of the farmers in the region who cannot get the desired yield from the soil resources.

Project Characteristics:
Irrigation

Project Location Erzurum Province, Hinis District
Water Supply Başköy Dam
Irrigation Area (ha) 20585
Type of Irrigation
Total Length of Main Pipe (m) 31532.58
Total Network Length (m): 612908.55

Scope of Services:
Preparation of projects.
Preparation of Green File and Discovery
Preparation of GIS