The definition of business:
Construction drawings for water treatment plant with a capacity of 540,000m3/day was prepared. Regulation on the Quality of Water Intended for Human Consumption (2013) is the basis of the design. Raw water transmitted to treatment plant will conveyed to 4 storage tanks. Water then will be provided to 31 villages via transmission lines with a total length of 32,350m.
Value 100,000,000 TL (USD 35.7M)
Scope of Works
The scope consists of a comprehensive site investigation including trial pits and carrying out the appropriate laboratory tests over representative disturbed and undisturbed soil samples; evaluation of the field observations and laboratory test results; and finally providing the recommendations for mitigation of the geotechnical problems pertaining to the project site including the rough estimates of cost.
Our Role
•Preparation of construction drawings of water treatment plant,
•Process, hydraulic, structural calculations,
•Technical specifications for the procurement of equipment andinstallation,
•Bill of quantities, cost estimates
•Landscape and lighting esigns,
•Geographic Information System (GIS) study,
•Design of Energy Transmission Lines
Challenges of the project
•One of the largest potable water treatment plant design projectcompleted in recent years (tendered by DSI)
•Completed within a very challenging schedule