The definition of business:
As stated in the Pump-Irrigation Planning Report of Bebek-1 and Arslanoğlu Units from Atatürk Dam Lake; Within the scope of the project, a total of 6240.0 ha agricultural land, 5656.0 ha gross with Aslanoğlu unit and 586.0 ha gross with Bebek-1 unit, will be irrigated pumped from the Atatürk Dam Lake.
Project Characteristics:
Irrigation
Project Location Adıyaman County Central District
Water Supply Atatürk Dam
Irrigation Area (ha) 6259,7
Type of Irrigation Drip + Sprinkler
Total Length of Main Pipe (m) 12617,75
Length of the Mains (m) 202983,56
Facilities (BABY-1 PUMP)
Number of Pumps 3
Pump Type Vertical Shaft Pump
Installed Power (kVA) 1000
Head (Hm) 72,64
Facilities (ASLANOGLU PUMP)
Number of Pumps 8
Pump Type Vertical Shaft Pump
Installed Power (kVA) 2 * 7500
Head (Hm) 105
Scope of Services:
Preparation of projects.
Preparation of Green File and Discovery
Preparation of GIS