The definition of business:

Contract 1
-Preparation of Flood Protection of Settlements and Lands of Nilufer Stream and Side Rivers – Preparation of Master Plan Report – Preparation of flood protection projects of Nilufer River and its side streams within the framework of Maser Plan Report.

Master Plan Report Features:
Project Area Drainage Area: 680 km²
The creeks evaluated within the scope of the report: Nilufer Stream, Hasanaga Stream, Ayvali Stream, Cagrisan Stream, Durdane Stream, Drying Bloody, Delicay Stream, Ismetiye Stream, Karaoglan Stream, Cenup Canal, Golbasi Barasi Main Evacuation Channel

Characteristics of the Flood Protection Project:
Total Flood Protection P. Length: 267,465 m
Projected Rivers: Nilüfer Creek, Dürdane Creek, Cenup Channel, Gölbaşı Channel, Deliçay Creek, Hasanağa Creek, Çağırışan Creek, Karaoğlan Creek, Balıklı Creek

Scope of Services:
– Prevention of Flood Protection of Settlements and Lands of Nilufer River and Side Rivers – Preparation of the Master Plan Report – Preparation of Hydrology Report – Preparation of flood protection projects of Nilufer River and its side streams within the framework of the Master Plan Report. – Preparation of geological surveys. – Preparation of maps and expropriation plans.
– Preparation of Relocation Projects.