The definition of business:
Contract 1
– Adapazarı (Ballıkaya Dam) Drinking Water Treatment Plant Application Projects
– Plant Capacity 540,000 m³ / day ”
Property Features:
Capacity: | Maximum, m3 / day (Qmax): 540,000 Minimum, m3 / day (Qmin): 67,500 |
Treatment Method: | Conventional Drinking Water Treatment Plant |
cascade | |
Pre-Ozone Unit | Yes |
Number of Quick Mixing Units | 6 units with Hydraulic Mixer Diplodtd> |
Slow Mixing Units NUMtd> | 6 units with Hydraulic Mixer Diplodtd> |
Clarifier Type And Number | Mud Blanket type 12 units |
Filter Structure | Quick sand filter with 28 units Filtration speed V = 11 m³ / m².h |
Chlorine Contact Tank | Two units with a 30 min holding time |
Clean Water Tank | 22,500 m³ two-chamber total |
Sludge Concentration Tank | 4 units of 21 m diameter |
Belt Filter |
Scope of Services:
Adapazarı (Ballıkaya Dam) Drinking Water Treatment Plant Application Projects (Architectural, Mechanical, Static, Electrical, Sanitary, Infrastructure, etc.)